In accordance with our standard contract the following outlines the progressive building stages.
Base / Slab Stage
A building with a concrete floor, other than a suspended concrete slab floor ? the stage when the building's floor is finished.
Stage 1: Base/Slab Stage
Frame Stage
The stage when a building's frame is finished.
Stage 2: Frame Stage
Lock-up / Enclosed Stage
For a building means the stage when:
- the external wall cladding is fixed; and
- the roof covering is fixed, but without:
- soffit linings necessarily having been fixed; or
- for a tile roof – pointing necessarily having been done; or
- for a metal roof – scribing and final screwing off necessarily having been done; and
- the structural flooring is laid; and
- the external doors are fixed (even if only temporarily), but, if a lockable door separating the garage from the rest of the building has been fixed, without the garage doors necessarily having been fixed; and
- the external windows are fixed (even if only temporarily)
Stage 3: Lock-up/Enclosed Stage
Pre-Paint Stage / Fixing Stage
The stage when all internal lining, architraves, cornice, skirting, doors to rooms, baths, shower trays, wet area tiling, built-in shelves, built-in cabinets and built-in cupboards of a building are fitted and fixed in position.
Stage 4: Pre-Paint Stage/Fixing Stage (Exterior)
Stage 4: Pre-Paint Stage/Fixing Stage (Interior)
Practical Completion Stage / Final Stage
Plumber fit-out, electrical fit-out, shower screens, final fit, external concrete, pergola, cleaner, carpet, final site clean, paint final, landscape, fencing, blinds, final inspection.
Stage 5: Practical Completion Stage/Final Stage (Exterior)
Stage 5: Practical Completion Stage/Final Stage (Interior)